BTM power deployment

What combination of grid, generation and storage gets you to firm power?

Compares GRID ONLY, GRID + GENERATION, GRID + BESS and GRID + BESS + GENERATION against your declared redundancy policy, each priced and dated from what you enter below — never priced at zero when a unit is uncosted. This is screening-level engineering: a directional read from a flat load assumption, not a bankable number. The API accepts a fuller request, including a real interval load profile.

Readiness data (optional — leave blank and the engine reports it as missing rather than guessing)

A flat load assumption is a screening-level figure, not a measurement — the assessment says so on every reading it produces. Upload a real interval export via the API for a customer-measured evidence class instead. Protection coordination always requires a licensed engineer, whatever is entered above — no field here can clear that gate.