Time-to-Power

Which route gets this hall to power first — and how sure are we?

Describe one hall. The engine solves it once and lays the scenarios side by side: racks deployable now and after relief, what binds, when full capacity could energise (with a low–high band and the evidence class behind it) and what the works cost. It will not date a scenario whose lead time is unknown, will not rank on a price it does not have, and does not date grid reinforcement — that needs the network operator's offer. Screening-level engineering; not an issued opinion.

Free, no account. When it is worth taking further, save it to a project, give whoever approves the spend a read-only page (the decision, what it rests on, the evidence class behind each date), and commission the next step from there — the Density Screen starts at €4,500. See pricing.

The hall

Optional — leave blank and the engine names each as an assumption instead of guessing

On-site supply you are considering

Needed to compare the behind-the-meter scenario. Lead times you enter are treated as assumptions (E0) until a supplier quotation is accepted, and the comparison says so.

No result yet. Enter your hall, or load the synthetic example, then compare. Nothing is shown until the engine has solved it.