What an existing hall is actually being asked to carry.

Every figure below comes from the manufacturer’s own published material and is used unchanged by the engine that screens halls. Vendor-sourced values are marked as such in the provenance of every study they appear in.

Data-center hall with rows of high-density compute racks and overhead liquid-cooling pipework.
High-density AI rack base standing on a raised-floor tile system with liquid-cooling connections at the cabinet.
PlatformRack kWPeakLiquidResidual airMax inletFlowFloorFeed
NVIDIA GB200 NVL7272 GPUs · shippingQCT QoolRack GB200 NVL72 technical brief, 2025 [V]13213287%17.2 kW45 °C125 l/min1,889 kg/m²200 A
NVIDIA GB300 NVL7272 GPUs · shippingLenovo Press LP2357, GB300 NVL72, 2026 [V] · NVIDIA NVL72 AI Factory Reference Architecture, 2026 [V]13515590%13.5 kW45 °C130 l/min1,944 kg/m²205 A
Generic DLC server rack, 50 kW32 GPUs · shippinggeneric archetype — no manufacturer, no source505575%12.5 kW40 °C72 l/min1,250 kg/m²76 A

Residual air

is not zero

Liquid cooling shrinks the air load; it does not remove it. The remainder still needs the plant the hall already has.

Floor loading

against ~1,220 kg/m²

A TIA-942 Rated-3 raised floor design value. Two of these platforms exceed it distributed, before any point load at the castors.

Max inlet

sets your approach

The gap between your facility water and this figure is the approach a CDU actually has to work at — rarely the 5 K on the datasheet.

Deliberately absent

Platforms whose rack power the manufacturer has not published are absent by design rather than pending. An invented number in a capacity study is how an engineering reputation ends.

vr200_nvl144
NVIDIA has not published rack power. Third-party estimates 190-230 kW are unverified.
rubin_ultra_nvl576
~600 kW is a stated target from GTC reporting, not a specification.
amd_helios_mi450
AMD has not published rack-level power for MI450/MI455X.

Can your hall take one of these?